日3
Bacolod Day 3
2017年3月24日, フィリピン ⋅ ☀️ 17 °CWe had breakfast at 6:45, and the first day of construction started at 8 in the morning. Students were divided into 3 groups, 1st group was assigned in the production line (bamboo, metal works), theもっと詳しく