Dzień 3
Bacolod Day 3
24 marca 2017, Filipiny ⋅ ☀️ 17 °CWe had breakfast at 6:45, and the first day of construction started at 8 in the morning. Students were divided into 3 groups, 1st group was assigned in the production line (bamboo, metal works), the Czytaj więcej