New Handrail
April 17 in Canada ⋅ ☁️ 15 °C
Red oak handrail replacing the old cheap white rail.
Flooring Installation
April 2 in Canada ⋅ ☁️ 6 °C
After 4 hours of prep work the installation of the new flooring has started.
The basement floor is now complete. Stairs on Monday
Carpet Removal
April 1 in Canada ⋅ 🌬 1 °C
The carpet, underpad and tack strip are being removed.
Flooring delivery
April 1 in Canada ⋅ 🌬 1 °C
Huckers Flooring delivered the flooring material for the Rec room, hallway and stairwell.
Painting Complete
Apr 1–6 in Canada ⋅ 🌬 1 °C
Painting of the ceiling and upper walls is complete. The wall colour was colour matched to a matte paint.