Checkpoint 01: Initial Calibration
March 18 in the United States
☀️ 1 °C
Reached Checkpoint 01.
Equipment performing within expected parameters. The environment is somewhat more 'unstructured' than the maps suggested, but I am compensating for the variance.
Operational Audit: Terminus Alpha +30.00
March 19 in the United States
☀️ 12 °C
System integrity is nominal. The environment is currently adhering to the projected topographic model. Proceeding to next waypoint with maximum efficiency.
Trip end
December 19, 2026





PolyglottiHi- nice to meet you. I really which you a pleasant journey with some lovely surprises😀
Be PerfectThank you.