Foreword.
1985年4月7日, オーストラリア
Easter 1985. We first discussed the possibility of moving to Molyullah.
Janette has known Molyullah all her life because of her Uncle Lex living here.
I first came when I met Janette in 1976.
Fromもっと詳しく
Lex Devitt.
1985年4月8日, オーストラリア
Lex was a Melbourne boy, born and bred. He lived in North Caulfield with his parents and two older sisters. He attended Caulfield Grammar School.
He was an apprentice at Kelly and Lewis Engineering inもっと詳しく
The site.
1989年10月25日, オーストラリア
The first site we considered was near the stone hut. We even fenced off a block and planted fruit trees. Access in wet weather might have proved difficult though.
It was then decided that our currentもっと詳しく
The shed and the power.
1990年11月1日, オーストラリア
Lex got the power on in 1987. It came from Irene and Robert Erskine's line which comes in from Tatong.
It required seven poles, two on the Erskine’s' and five on Lex's.
That meant we would need onlyもっと詳しく
September 1996 - a start at last.
1996年9月1日, オーストラリア ⋅ 15 °C
I 'retired' and moved up in August 1996. We had sold our house in Nth Dandenong. Janette continued to work at PFD while living with her Mum, Paula Lee during the week. PFD didn't want to lose Janetteもっと詳しく
The slab.
1996年12月1日, オーストラリア
Once the site was levelled and the house footprint could be properly accommodated, it was time to think about the slab.
Ross McMahon was to pour the slab and he brought out formwork and set itもっと詳しく
The frame arrives.
1996年12月14日, オーストラリア
We had a call that the steel frame would be leaving Melbourne on Friday. Because it was oversize, it couldn't leave until after the peak hours had finished.
Doug, the PFD rep from Mansfield, came onもっと詳しく
Erection.
1996年12月20日, オーストラリア
Stuart, the manager at Dahlsens who organised our steel frame, and Boris, one of their builders, came up for a weekend to help erect the frame. They volunteered, saying a weekend in the country wouldもっと詳しく
Meanwhile, back at the shed.
1997年1月15日, オーストラリア
The frame is well advanced, and so is organising the next stages:-
*brickies sand, lime, cement, bricks for the chimney, blue foil insulation and brick ties - we have to supply everything. Theもっと詳しく
We have a frame!
1997年2月7日, オーストラリア
Frame inspection - passed!
8/2/97 took delivery of:-
Jotul wood heater
Stanley kitchen stove
Jetmaster open fire.
The stonies are booked in.
1997年2月9日, オーストラリア ⋅ ⛅ 22 °C
Once the frame was finished, we called David Broadhurst, our stoney, to let him know we were ready.
Everything now depended on what he had on. We were now totally dependant on when he would beもっと詳しく
Woo hoo - we have a loo!
1997年3月1日, オーストラリア
The only loo at the shed was a 'porta-potty'. With three stonies likely to be living here for a while, I would be emptying it every couple of days.
I bought a pan and installed it in the toilet at theもっと詳しく
March 11th 1997 - first stones are laid.
1997年3月11日, オーストラリア
David (the boss), Andrew and Sandy laid the first stones today.
David worked inside on the wall, fireplace and chimney. Andrew started on the SW corner of the living room. Sandy started on the cornerもっと詳しく
The cost of being a snorer.
1997年3月21日, オーストラリア
Snorers always seem to be the first to go to sleep, and their snoring keeps others awake.
David snores.
His 'friends' moved his bed out to the tractor carport.
Getting there.
1997年4月14日, オーストラリア ⋅ 22 °C
Over the next few weeks, the walls gradually grew.
We made the Benalla Ensign.
1997年4月25日, オーストラリア ⋅ 16 °C
It seemed that we had somehow got onto the local tourist map. People we didn't know would just turn up to have a look at what we were doing.
A reporter at the Benalla Ensign asked if he could run aもっと詳しく
Roof on.
1997年5月2日, オーストラリア ⋅ 16 °C
29th April - 2nd May - the gutter and roof fixed.
Two sheets of iron were taken off to allow the chimney to exit the house. I was to replace them once the chimney was complete. The plumbers would thenもっと詳しく
Chimney finished.
1997年5月9日, オーストラリア ⋅ 12 °C
The chimney is finished.
The back wall and the gables remain to be finished.
The stonework is finished.
1997年5月25日, オーストラリア ⋅ 12 °C
Not sure of the exact date ,but the stonies finished late May.
Now for the inside.
1997年5月26日, オーストラリア ⋅ 9 °C
The first thing to organise internally was the plastering. I had called three plasterers but when I said it was steel frame and ten foot ceilings, two weren't too interested. Graham 'Grubby' Hollandもっと詳しく
Jotul heater and Stanley stove.
1997年5月28日, オーストラリア ⋅ 16 °C
Stones were selected to make hearths for the stove and the heater.
Both had been held in place by standing them on bricks.
Starting with the stove, each one was held on a plank with a car jack at eachもっと詳しく
Electrician and plumber back to fit out.
1997年5月31日, オーストラリア ⋅ 10 °C
Next on the list are the plumber and electrician to do their fit out.
After that it's painting.
Painting.
1997年6月3日, オーストラリア ⋅ 11 °C
Painting isn't my favourite job but it's a lot easier when drips and splatters don't matter that much.
A bit of plumbing.
1997年7月10日, オーストラリア ⋅ 7 °C
The bath and the handbasin in the loo were installed. Having the bath in place meant we had a shower.
A temporary kitchen sink and benches were used - melamine on trestles.
Skirting and architrave.
1997年7月30日, オーストラリア ⋅ 15 °C
Skirting was needed for each room.
Architrave was needed for:-
5 double doors (external)
1 single door (external)
17 windows
8 internal doors (2 sides)
1 linen press
All were pre-cut andもっと詳しく