• Demo Part #2

    November 18, 2023 in the United States ⋅ ☀️ 43 °F

    The first demo revealed a concrete pour was used inside the house to level the floor. We removed all of that concrete. We may need to jack the house in some places in order to level up the floors. If this doesn't work we'll use a modern method of floor leveling that doesn't require as much weight as concrete. We also took down the ceiling to allow for vaulting in some areas to give the small space an airy and open feel. There were two layers of ceiling. One from 1980's and the other was original. The insulation in the attic was cotton. It was a messy job, but we are getting closer to an empty shell to begin with a new floor plan.Read more