Opening Up the Ceiling Space
22 novembre 2023, Stati Uniti ⋅ ☁️ 52 °F
With the header support beam in place and standing on two solid upright support beams the ceiling cross boards are ready to be removed. About 90% as open as it will eventually be. Just a few cuts leftLeggi altro
Cross Beam Install
21 novembre 2023, Stati Uniti ⋅ 🌬 55 °F
Brice installs a cross beam the entire length of the house to get ready to vault the ceiling.
Planning and Prep
20 novembre 2023, Stati Uniti ⋅ ☀️ 52 °F
Brice did a bit more clean up and then we planned and measured for beam support both temporary and permanent to allow the ceilings to be lofted throughout the house. We measured window and door spaceLeggi altro
Demo Part #2
18 novembre 2023, Stati Uniti ⋅ ☀️ 43 °F
The first demo revealed a concrete pour was used inside the house to level the floor. We removed all of that concrete. We may need to jack the house in some places in order to level up the floors. IfLeggi altro
Demo Part #1
18 ottobre 2023, Stati Uniti ⋅ 🌙 66 °F
To ready for the renovation, first out with the old. The walls and old carpeting are pulled up. Old wiring and plumbing is removed. Appliances and kitchen is removed.
A New Sewer Line
18 agosto 2023, Stati Uniti ⋅ ⛅ 86 °F
The sewer line was attached to the neighbors. The City of Billings recommends separating to avoid issues. The little house gets its own sewer line and a required clean out feature.
A Place to Call Home
18 maggio 2023, Stati Uniti ⋅ ☀️ 64 °F
Roxanne purchases an original tiny house 2 blocks away from Pioneer Park. This will be a fun renovation project and, once completed, a great way to stay close to family and have a comfortable homeLeggi altro