Opening Up the Ceiling Space
2023年11月22日, アメリカ ⋅ ☁️ 52 °F
With the header support beam in place and standing on two solid upright support beams the ceiling cross boards are ready to be removed. About 90% as open as it will eventually be. Just a few cuts leftもっと詳しく
Cross Beam Install
2023年11月21日, アメリカ ⋅ 🌬 55 °F
Brice installs a cross beam the entire length of the house to get ready to vault the ceiling.
Planning and Prep
2023年11月20日, アメリカ ⋅ ☀️ 52 °F
Brice did a bit more clean up and then we planned and measured for beam support both temporary and permanent to allow the ceilings to be lofted throughout the house. We measured window and door spaceもっと詳しく
Demo Part #2
2023年11月18日, アメリカ ⋅ ☀️ 43 °F
The first demo revealed a concrete pour was used inside the house to level the floor. We removed all of that concrete. We may need to jack the house in some places in order to level up the floors. Ifもっと詳しく
Demo Part #1
2023年10月18日, アメリカ ⋅ 🌙 66 °F
To ready for the renovation, first out with the old. The walls and old carpeting are pulled up. Old wiring and plumbing is removed. Appliances and kitchen is removed.
A New Sewer Line
2023年8月18日, アメリカ ⋅ ⛅ 86 °F
The sewer line was attached to the neighbors. The City of Billings recommends separating to avoid issues. The little house gets its own sewer line and a required clean out feature.
A Place to Call Home
2023年5月18日, アメリカ ⋅ ☀️ 64 °F
Roxanne purchases an original tiny house 2 blocks away from Pioneer Park. This will be a fun renovation project and, once completed, a great way to stay close to family and have a comfortable homeもっと詳しく