Opening Up the Ceiling Space
22 ноября 2023 г., Соединенные Штаты ⋅ ☁️ 52 °F
With the header support beam in place and standing on two solid upright support beams the ceiling cross boards are ready to be removed. About 90% as open as it will eventually be. Just a few cuts leftЧитать далее
Cross Beam Install
21 ноября 2023 г., Соединенные Штаты ⋅ 🌬 55 °F
Brice installs a cross beam the entire length of the house to get ready to vault the ceiling.
Planning and Prep
20 ноября 2023 г., Соединенные Штаты ⋅ ☀️ 52 °F
Brice did a bit more clean up and then we planned and measured for beam support both temporary and permanent to allow the ceilings to be lofted throughout the house. We measured window and door spaceЧитать далее
Demo Part #2
18 ноября 2023 г., Соединенные Штаты ⋅ ☀️ 43 °F
The first demo revealed a concrete pour was used inside the house to level the floor. We removed all of that concrete. We may need to jack the house in some places in order to level up the floors. IfЧитать далее
Demo Part #1
18 октября 2023 г., Соединенные Штаты ⋅ 🌙 66 °F
To ready for the renovation, first out with the old. The walls and old carpeting are pulled up. Old wiring and plumbing is removed. Appliances and kitchen is removed.
A New Sewer Line
18 августа 2023 г., Соединенные Штаты ⋅ ⛅ 86 °F
The sewer line was attached to the neighbors. The City of Billings recommends separating to avoid issues. The little house gets its own sewer line and a required clean out feature.
A Place to Call Home
18 мая 2023 г., Соединенные Штаты ⋅ ☀️ 64 °F
Roxanne purchases an original tiny house 2 blocks away from Pioneer Park. This will be a fun renovation project and, once completed, a great way to stay close to family and have a comfortable homeЧитать далее