Opening Up the Ceiling Space
22 november 2023, Förenta staterna ⋅ ☁️ 52 °F
With the header support beam in place and standing on two solid upright support beams the ceiling cross boards are ready to be removed. About 90% as open as it will eventually be. Just a few cuts leftLäs mer
Cross Beam Install
21 november 2023, Förenta staterna ⋅ 🌬 55 °F
Brice installs a cross beam the entire length of the house to get ready to vault the ceiling.
Planning and Prep
20 november 2023, Förenta staterna ⋅ ☀️ 52 °F
Brice did a bit more clean up and then we planned and measured for beam support both temporary and permanent to allow the ceilings to be lofted throughout the house. We measured window and door spaceLäs mer
Demo Part #2
18 november 2023, Förenta staterna ⋅ ☀️ 43 °F
The first demo revealed a concrete pour was used inside the house to level the floor. We removed all of that concrete. We may need to jack the house in some places in order to level up the floors. IfLäs mer
Demo Part #1
18 oktober 2023, Förenta staterna ⋅ 🌙 66 °F
To ready for the renovation, first out with the old. The walls and old carpeting are pulled up. Old wiring and plumbing is removed. Appliances and kitchen is removed.
A New Sewer Line
18 augusti 2023, Förenta staterna ⋅ ⛅ 86 °F
The sewer line was attached to the neighbors. The City of Billings recommends separating to avoid issues. The little house gets its own sewer line and a required clean out feature.
A Place to Call Home
18 maj 2023, Förenta staterna ⋅ ☀️ 64 °F
Roxanne purchases an original tiny house 2 blocks away from Pioneer Park. This will be a fun renovation project and, once completed, a great way to stay close to family and have a comfortable homeLäs mer