• Italy to Germany via Switzerland

    18 Nisan 2017, Almanya ⋅ ⛅ 4 °C

    An early start (8am) steady progress through intricate and twisting Italian autostrada. Then came holdups:
    - malfunctioning toll booths
    - contraflow through the St Gotthard tunnel
    - a breakdown round Basel
    all with accompanying queues

    Weather before the big tunnel C. 13c. In the tunnel 32c, after the tunnel 0c and a snow storm

    Happy break of luck was finding a guesthouse in Mullheim with the minimum of effort.
    Okumaya devam et