Day 2
Crossing the bridge into Spain
October 19, 2022 in Portugal ⋅ 🌧 63 °F
Ponte Rodo-Ferroviária de Valença
This bridge was originally build back in 1882. The upper deck is for trains and the lower deck for cars. People walking can take either the right or left side decks.