• Construction started

    9. joulukuuta 2023, Yhdysvallat ⋅ ☀️ 9 °C

    It took a while to get construction going because I had to wait for the deliveries from Lowe's with all of the lumber and rebar for forming the slab. Once the delivery came I started building two walls right away and put them aside. The next day I formed for the slab and put the rebar in. On Friday the concrete truck came and I poured the entire slab by myself and finished her up with a broom finish.

    It came out better than most slabs I've seen. On Saturday it was off to the races for framing and I stood all four walls and have a little bit left to go tomorrow when Chuck is coming to help me.