• 2nd Satellite, L7N in preparation!

    April 19, 2023, North Sea ⋅ 🌬 9 °C

    After a successful preparation campaign at L7A, Hydra is now jacked-up at L7N for similar preparation works.
    On the agenda for a week: lifting points inspection, topside legs pinning, topside/jacket legs cutting, helideck opening for sling path clearance...!Read more