• Conductor removal scope at L7H

    April 24, 2023, North Sea ⋅ 🌬 7 °C

    Currently jacked-up at L7H, the Hydra now faces an extended scope, now including the removal of the three (3) conductors.
    Cut during the P&A campaign at -6 meters below seabed, these conductors (weighing ~70mT each) are now ready to be picked-up, and lifted in sections on to the Hydra deck.
    This scope is in addition to the original topside preparation works required to allow for the L7H topside to be lifted later this year!