• Lifting of P5,P6N,L7PK and L7C

    May 15, 2024, North Sea ⋅ ☀️ 13 °C

    In the period 09-05 and 10-05 the "P5" module and the "Qwest" module were lifted by Hebolift 10 (P5) and Matador 3 (QW)
    Q west was the last lift on the second barge and the barge left shortly after installation and sea fastening.(picture in next footprint)
    At 18-05 the "P6North" module (facilitating former offices and Controlroom...) was removed from L7P .
    At 26-05 the L7PK top side was lifted by Hebolift 10 and at 18-06 the L7C top side was lifted from L7CC to complete the third barge.